Chipped edges, split fixing holes or a bent runner should be photographed with the part label visible. Keep the packaging and contact the supplier about replacements. A damaged structural panel should not be disguised with a cosmetic patch to finish assembly.
Describe where the cartons are stored and the final room. Working space is needed to protect finished panels while parts are organised. Moving other furniture, stairs and heavy items should be discussed beforehand rather than assumed to be included.
Tall or drawer-heavy storage may have restraint requirements even when marketed as freestanding. Review the instructions and intended wall before assembly. Suitable fixing, permission and safe access must be established; the finished unit should not conceal an unresolved stability issue.
The agreed service covers panel assembly, runners, hinges, alignment and suitable restraint review. Exclusions: Fitted kitchen installation, service connections, bespoke cabinets, wardrobe/desk duplication.