Use the supports and permitted positions supplied for the cabinet. Include additional shelves in the product list before the quote. A shelf that looks similar may have different dimensions or a different supported load, so compatibility needs to be established.
Describe where the cartons are stored and the final room. Working space is needed to protect finished panels while parts are organised. Moving other furniture, stairs and heavy items should be discussed beforehand rather than assumed to be included.
Chipped edges, split fixing holes or a bent runner should be photographed with the part label visible. Keep the packaging and contact the supplier about replacements. A damaged structural panel should not be disguised with a cosmetic patch to finish assembly.
The agreed service covers panel assembly, runners, hinges, alignment and suitable restraint review. Exclusions: Fitted kitchen installation, service connections, bespoke cabinets, wardrobe/desk duplication.