A wardrobe can arrive in separate packs for the frame, doors and internal fittings. Compare carton labels with the delivery list before scheduling. A missing back panel or hardware bag can prevent the next stage even when most of the furniture is present.
Some wardrobes are assembled on the floor before being lifted upright. Ceiling height, the turning space and nearby furniture all matter. Send the assembly instructions and room dimensions so the workable sequence can be assessed before panels are unpacked.
Photograph the current stage before trying to correct it. Reversed panels, damaged cam fittings or stripped holes can change whether completion is practical. Work already started may need careful disassembly, and existing damage should be identified in the enquiry.
The agreed service covers manufacturer-directed assembly, door alignment and suitable anti-tip fixing review. Exclusions: Bespoke fitted wardrobes, room alterations, electrics, glass modifications, unsupported anchoring.