Skirting, room doors and nearby power points can affect the final position. Include a wide room photo with your measurements. A freestanding product should not be cut or converted into fitted cabinetry simply because the planned recess is too narrow.
Rails, shelves and drawers can add several stages to a wardrobe build. List the accessories separately from the main frame. Their positions, supports and compatibility should come from the supplied system instructions rather than an improvised combination of similar parts.
A wardrobe can arrive in separate packs for the frame, doors and internal fittings. Compare carton labels with the delivery list before scheduling. A missing back panel or hardware bag can prevent the next stage even when most of the furniture is present.
The agreed service covers manufacturer-directed assembly, door alignment and suitable anti-tip fixing review. Exclusions: Bespoke fitted wardrobes, room alterations, electrics, glass modifications, unsupported anchoring.