Identify cords, chains and all supplied safety components at the enquiry stage. Product instructions and applicable safety requirements must be followed. An incomplete or unsafe operating system should not be installed as if it were an ordinary uncorded rod.
Show the full opening and explain the intended mounting position. Handles, opening windows and the depth of the recess can interfere with the curtain or fittings. The final layout should be checked against the product before any drilling is agreed.
The product type determines the bracket and fixing arrangement. Send the exact model and all supplied components. A rod kit and a curtain track are not interchangeable systems, and missing brackets should be resolved before their installation is scheduled.
The agreed service covers non-powered rods/tracks, compatible brackets, positioning and operation checks. Exclusions: Electrical motors/wiring, unsuitable substrates, unassessed cord hazards, unsupported high access.