Skirting lengths need a practical delivery and handling route. Mention stairs, narrow halls and room access before purchasing. The final run measurement alone does not show whether a long board can be brought into the workspace without additional joints or handling constraints.
Clarify filling, preparation and whether painting is included. Factory-primed material may still need finishing after installation. A fitted run and a fully decorated room are different outcomes, so the quote should identify who completes each stage.
Measure each complete run and identify door breaks, returns and short sections. This service concerns replacing ordinary runs, while an isolated small damaged spot may suit existing skirting repair. A clear take-off avoids treating a room fit as a series of unrelated patch jobs.
Remove the agreed decorative runs, fit compatible replacement skirting with suitable joints and fixings, and prepare the agreed finish. Scope limits: Complete ordinary decorative runs only. No structural wall work, hazardous materials, concealed-service alterations or repair of underlying floor movement.