Clarify filling, preparation and whether painting is included. Factory-primed material may still need finishing after installation. A fitted run and a fully decorated room are different outcomes, so the quote should identify who completes each stage.
Internal corners, external corners and returns affect the cutting and joining plan. Rooms are not assumed perfectly square from a sketch. The aim is suitable ordinary decorative joints, with any existing wall irregularity discussed before promising a flawless straight line.
Show the finished floor and any planned change to flooring. The new skirting needs an agreed position at that junction. Decorative trim is not a way to conceal unresolved floor movement, and flooring alteration is not automatically part of a skirting replacement quote.
Remove the agreed decorative runs, fit compatible replacement skirting with suitable joints and fixings, and prepare the agreed finish. Scope limits: Complete ordinary decorative runs only. No structural wall work, hazardous materials, concealed-service alterations or repair of underlying floor movement.