The selected system may require more than one stage with drying between applications. Follow the product sequence instead of treating an extra thick coat as equivalent. Access and weather need to support those stages before scheduling is confirmed.
Touch-dry paint may not be ready for furniture or routine foot traffic. Plan an alternative route where the deck serves a doorway. Return-to-use timing follows the product and actual conditions; the job does not include a fixed universal drying promise.
Show both intact and peeling areas. A new coat relies on suitable preparation and sound underlying material. Painting over loose film can leave the same weakness underneath, so the quote needs to distinguish ordinary preparation from extensive stripping or board repair.
Prepare the accepted sound surface and apply the agreed compatible deck-coating system in its required stages. Scope limits: Compatible film coatings on sound accessible timber only. No slip certification, hazardous stripping, structural repairs or waterproofing-system claims.