a finish looks damaged and needs preparation before painting. Fit and finish an agreed suitable local plasterboard patch and prepare it for the next finishing stage.
Signs: a stable local hole, dent, crack, patch edge or surface mark is visible or a finish looks damaged and needs preparation before painting. Causes: ordinary impact damage or local surface wear or a previous patch or coating that needs preparation.
Patch dimensions affect the needed backing, sheet piece and joint treatment. For plasterboard patch repair, this detail is reviewed before work is accepted so the agreed task stays practical and proportionate. No framing repair, active leak diagnosis, concealed services, asbestos, hazardous materials or structural wall work.
Do not assume an apparently empty wall has no services behind it. For plasterboard patch repair, this detail is reviewed before work is accepted so the agreed task stays practical and proportionate. No framing repair, active leak diagnosis, concealed services, asbestos, hazardous materials or structural wall work.
Fit and finish an agreed suitable local plasterboard patch and prepare it for the next finishing stage. Limits: Suitable stable local plasterboard patching only. No framing repair, active leaks, concealed-service work, asbestos, hazardous materials or structural wall work.