a finish looks damaged and needs preparation before painting. Fit and finish an agreed suitable local plasterboard patch and prepare it for the next finishing stage.
Signs: a finish looks damaged and needs preparation before painting or a stable local hole, dent, crack, patch edge or surface mark is visible. Causes: a previous patch or coating that needs preparation or minor finish movement at a suitable stable surface.
A patch needs stable support rather than unsupported joint compound. For plasterboard patch repair, this detail is reviewed before work is accepted so the agreed task stays practical and proportionate. No framing repair, active leak diagnosis, concealed services, asbestos, hazardous materials or structural wall work.
Do not assume an apparently empty wall has no services behind it. For plasterboard patch repair, this detail is reviewed before work is accepted so the agreed task stays practical and proportionate. No framing repair, active leak diagnosis, concealed services, asbestos, hazardous materials or structural wall work.
Allow the patch system to dry and avoid loading or repainting it before the agreed preparation is complete. Limits: Suitable stable local plasterboard patching only. No framing repair, active leaks, concealed-service work, asbestos, hazardous materials or structural wall work.