Furniture and occupied-room access need planning around protection, ventilation and drying. Identify rooms that must remain available. Completion of application does not necessarily mean immediate ordinary use; reopening follows the selected product and actual conditions.
The accepted ceiling must be dry and stable. Ongoing leaks, sagging, hazardous material and structural concerns need appropriate separate assessment. A stain is not diagnosed from a photograph, and a coat of paint should not be offered as a remedy for its unresolved source.
Show lights, fans and other fixed items before the visit. Ordinary protection and cutting around them is different from disconnecting or moving electrical equipment. Any fixture work requiring a licensed trade must be arranged separately rather than assumed within the ceiling quote.
Protect the room and fixed fixtures, prepare the accepted sound surface and paint the agreed ceiling plane in suitable stages. Scope limits: Ordinary dry stable accessible ceilings only. No electrical fixture work, leak diagnosis, sagging ceilings, high-access specialist work or hazardous materials.